Prepared the cost estimate, CDP, BEP, and DEP for a 3 TPD carbon capture facility for Abhitech Energycon Ltd.
Conceptual Development and Cost Estimation Package for Flue Gas Sulphur Dioxide Reduction.
Finished the engineering design for the Catalytic Vapor Phase System, including all associated upstream and downstream equipment.